Search results for "AvCar%u6210%u4eba%u8bba%u575b-(%u2714%ufe0f%u63a8%u8350AvCar%u6210%u4eba%u8bba%u575b%u7f51%u5740:2020234%u3002xyz %u2600%ufe0f)-AvCar%u6210%u4eba%u8bba%u575b%u89c5%u82b1%u9601-AvCar%u6210%u4eba%u8bba%u575b('t', 'm', 'n', '3', 'e', '8')"
159 results found
Water safety (SHTM 2027, SHTM 2040 and SHTM 04-01 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 04-01 Parts A, B, C, D, E F and G: water safety for healthcare premises.
Forensic medium-secure care for patients with learning disabilities
Some adults with learning difficulties require a level of security when being treated. This risk share scheme funds that care. Learn more about it.
Trace element and micronutrient diagnostic and research laboratory
Specialising in the measurement and interpretation of trace elements and vitamins in clinical samples. Find out more.
Apply for rates and rental reimbursement
Apply for rates and rental reimbursement.
nDCVP
New DCVP (nDCVP) is a replacement for the current pharmacy payment system.
Fire Safety Precautions and Engineering (SHTM 81)
Scottish Health Technical Memorandum 81 Parts 1, 2 and 3: Fire precautions for new premises, fire engineering and atria guidance.
Decontamination Facilities (SHPN 13)
Scottish Health Planning Note 13 Parts 1, 2 and 3: guidance covers facilities for central, local and endoscope decontamination units
Primary Healthcare Premises (SHPN 36)
Scottish Health Planning Note 36 Parts 1, 2 and 3: provides advice on the design and specification requirements for Primary Healthcare Premises.
Mains signalling (SHTM 2035)
Scottish Health Technical Memorandum 2035 Parts 1, 2 and 3: for mains signalling on the low-voltage installations associated with a single site
NHSScotland Waste Management Guidance (SHTN 03-01)
Scottish Health Technical Note 03-01: NHSScotland waste management guidance.