Search results for "miner application%ud83d%udcafearnmining.com"
111 results found
Building component series - Ceilings (SHTM 60)
SHTM Building Component Series Ceilings
Building component series - Laboratory storage systems (SHTM 67)
This SHTM offers guidance on the technical design and output specifications of the systems for fitting out laboratories.
Notes for Boards: Infection Prevention and Control (IPC) Risks in the Design of a Critical Care Unit (CCU), Level 2 and 3 Care
Summary of extant guidance relevant to design of a level 2 and 3 care facilities. Useful to IPC teams involved in design or refurb of facilities.
Notes for Boards: Infection Prevention and Control (IPC) Risks in the Design of a Neonatal Unit (NNU)
Summary of guidance on the design of a level NNU facility. Useful to IPC teams involved in design or refurb of facilities.
Mains signalling (SHTM 2035)
Scottish Health Technical Memorandum 2035 Parts 1, 2 and 3: for mains signalling on the low-voltage installations associated with a single site
Robust recruitment
Report a change in circumstances
Learn how to notify the Scottish Infected Blood Support Scheme of changes in circumstances.
National supply chain security
Find information on how we make sure our standards and the security of our data and services is maintained.
Medical Gas Pipeline Systems (SHTM 2022 and SHTM 02-01 ARCHIVED)
(Archived) SHTM 02-01 Parts A and B: Medical gas pipeline systems design, installation, validation, verification and operation.
Board Committees
Our board is supported by four Committees.