Search results for "%u56fd%u8272%u539f%u521b%u6444%u5f71-(%u2714%ufe0f%u63a8%u8350%u56fd%u8272%u539f%u521b%u6444%u5f71%u7f51%u5740:2020234%u3002xyz %u2600%ufe0f)-%u56fd%u8272%u539f%u521b%u6444%u5f71%u5982%u68a6-%u56fd%u8272%u539f%u521b%u6444%u5f71('u', 'o', 'j', '2', 'b', '4')"
218 results found
Mains signalling (SHTM 2035)
Scottish Health Technical Memorandum 2035 Parts 1, 2 and 3: for mains signalling on the low-voltage installations associated with a single site
Medical Gas Pipeline Systems (SHTM 02-01)
Scottish Health Technical Memorandum 02-01 Parts A and B: medical gas pipeline systems design, installation, validation, verification and operation.
NHS Scotland Assure Events
Find out about upcoming NHS Scotland Assure events.
Platelets
Find out more packaging, transport, specification and order times for platelets we manufacture at the Jack Copland Centre for use across Scotland.
Fire Safety Precautions and Engineering (SFPN 00-02 and SHTM 81 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 81 Parts 1, 2 and 3: Fire precautions for new premises, fire engineering and atria guidance.
Decontamination - Washer-disinfectors (SHTM 2030)
Scottish Health Technical Memorandum 2030 Parts 1, 2 and 3: guidance for WDs for processing medical devices, laboratory ware and sanitary products.
Decontamination – Provision of compliant podiatry instruments (GUID 5007)
Reusable Medical Devices Decontamination Operational Group (RMD-DOG) and the College of Podiatry.
NHSScotland Waste Management Guidance (SHTN 03-01 ARCHIVED)
(Archived) Scottish Health Technical Note 3 and Parts A, B, C and D: NHSScotland waste management guidance.
Building Management Systems (SHTM 2005 and SHTM 08-05 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 08-05 Parts A, B, C and D: BMS responsibilities, design and operation.
Digital estate
Information, guidance and templates for Health Boards to scope and deliver BIM projects and digitisation of their estate.