Search results for "%u697c%u51e4%u8bba%u575b-(%u2714%ufe0f%u63a8%u8350%u697c%u51e4%u8bba%u575b%u7f51%u5740:2020234%u3002xyz %u2600%ufe0f)-%u697c%u51e4%u8bba%u575b%u5c0f%u6d77%u68e0%u8bba%u575b-%u697c%u51e4%u8bba%u575b('f', 'w', 'b', '9', 'j', '3')"
170 results found
HAI-SCRIBE (SHFN 30)
Scottish Health Facilities Note 30 Parts A, B and C: HAI-SCRIBE manual, implementation, assessment, questionsets and checklists.
Medical Gas Pipeline Systems (SHTM 2022 and SHTM 02-01 ARCHIVED)
(Archived) SHTM 02-01 Parts A and B: Medical gas pipeline systems design, installation, validation, verification and operation.
HAI-SCRIBE (SHFN 30 ARCHIVED)
(ARCHIVED) Scottish Health Facilities Note 30 Parts A, B and C: HAI-SCRIBE manual, implementation, assessment, question sets and checklists.
Fire Safety Precautions and Engineering (SHTM 81)
Scottish Health Technical Memorandum 81 Parts 1, 2 and 3: Fire precautions for new premises, fire engineering and atria guidance.
Decontamination Facilities (SHPN 13)
Scottish Health Planning Note 13 Parts 1, 2 and 3: guidance covers facilities for central, local and endoscope decontamination units
Primary Healthcare Premises (SHPN 36)
Scottish Health Planning Note 36 Parts 1, 2 and 3: provides advice on the design and specification requirements for Primary Healthcare Premises.
Mains signalling (SHTM 2035)
Scottish Health Technical Memorandum 2035 Parts 1, 2 and 3: for mains signalling on the low-voltage installations associated with a single site
What is financial crime?
Medical Gas Pipeline Systems (SHTM 02-01)
Scottish Health Technical Memorandum 02-01 Parts A and B: medical gas pipeline systems design, installation, validation, verification and operation.
Fire Safety Precautions and Engineering (SFPN 00-02 and SHTM 81 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 81 Parts 1, 2 and 3: Fire precautions for new premises, fire engineering and atria guidance.