Medical Gas Pipeline Systems (SHTM 2022 and SHTM 02-01 ARCHIVED)

Published on 01 June 2012

From: NHSScotland Assure

(Archived) SHTM 02-01 Parts A and B: Medical gas pipeline systems design, installation, validation, verification and operation.

Documents

Details

This series covers piped medical gases, medical and surgical air, and medical vacuum installations. It applies to all medical gas pipeline systems installed in healthcare premises and anaesthetic gas scavenging disposal systems.

  • Part A: design, installation, validation and verification
  • Part B: operational management

SHTM 02 supersedes all previous versions of SHTM 2022. Where SHTM 2022 has been used as the contractual document within current projects, SHTM 2022 would be applicable.

Click here to see the latest version of this Guidance

This file may not be suitable for users of assistive technology. If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email nss.feedback@nhs.scot. We will do our best to assist where possible and practicable. It would be helpful if you tell us what format you need and advise on any assistive technologies you are using.