(Archived) This guidance document sets out the acoustic criteria for the design and management of new and temporary healthcare facilities.
(Archived) SHTM 2009 and SHTM 08-04 Parts A and B: overview, management and design considerations for pneumatic tube transport systems.
(Archived) Operational guidance on electrical safety requirements for low voltage systems in healthcare premises.
(Archived) Operational guidance on electrical safety requirements for high voltage systems in healthcare premises.
Forms to get set-up for eDental
Scottish Health Technical Memorandum 06-01 Parts A and B: Electrical services supply and distribution design considerations and operational management
Scottish Health Technical Memorandum 02-01 Parts A and B: medical gas pipeline systems design, installation, validation, verification and operation.
A guide to managing and running your eSchedule reports
Access to guidance surrounding all aspects of using and understanding your eSchedule Payment Reports
The procedures set out in this guidance are intended to allow Authorising Engineers to fulfil the requirement of Regulation 4(2).